Project Description
Drill and install h-pile and precast concrete lagging for retaining walls along Norfolk Southern Railroad in Maidsville and Baxter, WV.
- Drill and install 179,100 LB (2,012 LF) of HP 14 x 89 piling
- Soil auger 930 LF of 30” diameter
- Rock core 380 LF of 30” diameter
- 240 CY of Class B30-A concrete
- 492 CY of #67 Backfill aggregate
- Install 260 precast concrete panels