Project Description

Drill and install h-pile and precast concrete lagging for retaining walls along Norfolk Southern Railroad in Maidsville and Baxter, WV.

  • Drill and install 179,100 LB (2,012 LF) of HP 14 x 89 piling
  • Soil auger 930 LF of 30” diameter
  • Rock core 380 LF of 30” diameter
  • 240 CY of Class B30-A concrete
  • 492 CY of #67 Backfill aggregate
  • Install 260 precast concrete panels

Project Details

  • Contract Value: $929,700

  • Location: Maidsville and Baxter, WV

  • Capabilities Highlighted:
    -Railroad
    -Drilled-Driven Foundations-Shoring and Piling Solutions