Project Description
Demolition of existing spillway and construction of new concrete spillway. Widening of the spillway from 66 feet to 102 feet and installing fuse gate system by Hydroplus. Improving the spillway approach channel. Flattening the upstream and downstream slopes of the dam. Installation of chimney and blanket filter drain. Replacement of existing intake valves and associated equipment. Installation of piezometers and water level instrumentation.
- 5.5 Acres of Clearing, Grubbing, and Stump Removal
- 2,544 CY of Cast-in-Place and Cement Concrete Structures
- 309,809 LB Reinforcement Bars
- 112 LF 16” Ductile Iron Pipe
- 250 LF 24” Ductile Iron Pipe
- 180 LF 18”- 30” Pipe Culverts
- 385 LF Standpipe Piezometers
- 5385 SY Channel Linings, Slope Protection, and Aprons
- 95,325 CY Excavation and Embankment
- 3722 SY Access Road Surfacing