Project Description
Soldier pile wall and concrete lagging design-build retaining wall, bituminous pavement, drainage, waterline, guide rail, and miscellaneous construction
- 544 LF Soldier Pile Wall
- 106 LF Rock Buttress
- 15,800 CY Class 1 Excavation
- 1,270 CY R-3 Rock
- 7,300 CY Surge Rock
- 1598 LF 42” Diameter Soil Drainage
- 594 LF 42” Diameter rock drainage
- 371 CY Class A Cement
- 70 EA 30”-42” Drilled Caissons 495 LF in Rock and 675 LF in Soil
- 206,600 LB Fabricated Structural Galvanized Steel
- 5,300 SF Precast Concrete Lagging