Project Description
Construction of single span precast concrete bulb Tee beam bridge 114’ long carrying Rt. 39 over the Youghiogheny River in Crellin, MD. Approach work, stormwater drainage, paving, guiderail, construct stormwater facility, removal of existing two span arch bridge.
- 4876 CY Class I, II, and III Excavation
- 170,000 LB Reinforcement Bars
- 2,067 CY Concrete
- 5440 CY Select Borrow
- 917 LF 12”-24” Reinforced Concrete Pipe
- 10- 48” Manholes and associated storm water drainage
- 3010 LF Steel H-Pile 12 x 63 Bearing piles
- 389 LF Curb and Gutter
- 700 LF Prestressed Concrete Bulb-Tee Beams
- 9894 SY Topsoil
- 15000 SY Seeding and Mulching