Project Description

Earthwork and site development for 1,050 MW, 2×1 combined-cycle power plant constructed on a brownfied redevelopment property. Excavation and grading for temporary facilities and roadway. Excavation and grading for power block and roadway. Drainage work for entire site. Install soil/nail retaining wall and maintain Erosion Sediment Controls.

  • 12,195 CY Strip/Haul and stockpile topsoil
  • 53,623 SY Erosion Control Blankets
  • 293,945 CY Mass Grading Excavation
  • 33,722 CY Mass Grading Blasting
  • 72,103 SY of surface stone for Laydown Area, Craft Parking, Loop Road, and Office Complex Area
  • 17,434 SF Soil Nail Retaining Wall
  • 16,000 CY Imported Select Fill
  • 1,000 LF 12”-36” RCP Pipe
  • 14,200 LF 15”-30” HDPE Pipe
  • 326 Tons of Stone Aprons
  • Installation of 13 Drainage Manholes
  • 5,900 SY of Asphalt Paving
  • News Article 1
  • News Article 2
  • News Article 3

Project Details

  • Contract Value: $11.7 million

  • Location: Jackson Township, Cambria Co., PA

  • Capabilities Highlighted:
    -Earthwork/Site Development
    -Energy