Project Description
Replacement of the existing structure carrying US Route 219 over Wolf Run with a two lane, two span Composite Steel I-beam Bridge including drainage, guiderail, and other miscellaneous construction
- 512 cy cast-in-place concrete
- 112,500 lb reinforcement bars
- 1,031 lf HP 12×74 bearing piles
- 4975 CY Class I Excavation
- 540 CY Class III Excavation
- 123,494 LB Fabricated Structural Galvanized Steel
- 1336 LF Pre-Drilling for Driven Piles
- 1218 Ton Selected Borrow R-Rock
- 3586 Ton Selected Borrow 206 Rock
- 847 SY Geocell Confinement System for Temporary Roadway
- 6830 SY Bituminous Asphalt Paving
- Temporary shoring and other miscellaneous bridge and roadway items.