Project Description
Replacement of SR 3030-A10 Bridge over US 30 with a two-lane single span prestressed concrete adjacent box beam bridge and approach roadway work including bituminous pavement, guiderail, signage, and other miscellaneous construction.
- 7,040 CY Class III Excavation
- 191,500 LB Reinforcement Bars
- Drilling of approximately (40) – 36″ holes with 30″ rock socket and installation of wide flange beams for temporary excavation support
- Removal of (2) – 120′ length, 90,000 Lb. Steel Girders from existing structure
- Installation and Tensioning of Temporary Bridge Support Beams
- 950 CY Concrete
- 12 – 48″ x 33″ Adjacent Concrete Box Beams, 103′ in length