Project Description
Demolition of existing reinforced concrete girder floor beam structure and replace with a one-span composite prestressed concrete spread box beam bridge over North Branch Blacklick Creek, including minor roadway approach work, guide rail upgrades and other miscellaneous construction.
- 835 CY Excavation/Borrow
- 966 SY Asphalt Paving
- 218 LF 48” x 21” Concrete Spread Box Beams
- 29,596 LB Reinforcement Bar
- 251 CY Concrete