Project Description
Demolition of existing bridge and construction of new three span bridge carrying SR 403 over the Conemaugh River. Installation of temporary shoring and arch culvert along Maple Avenue.
- 13,500 CY excavation of residual/hazardous soil and disposal
- 3,000 SY concrete paving
- 4,700 SY bituminous paving
- 360 LF BEBO arch culvert
- 2,600 CY cast-in-place concrete
- 415,000 LB reinforcement bars
- 431,000 LB fabricated structural steel
- 200 LF steel bearing piles