Project Description
Remove and replace bridge structure carrying Rt. 36 over Jennings Run and replace and rehabilitate retaining walls along stream, remove and replace pedestrian bridge, roadway drainage and paving, curb, gutter and sidewalk, install erosion and sediment controls, topsoil and seeding, and install guide rail.
- 1259 LF Concrete Sidewalk
- 3516 LF 7” Diameter Micropiles
- 3200 CY Class I, II, III Excavation
- 1447 CY Common Borrow
- 1685 CY Furnished Topsoil
- 128,000 LB Reinforcement Bars
- 1500 CY Concrete
- 531 LF Prestressed Concrete Adjacent Slab Beams