Project Description
Replacement of existing structure carrying Tower Road over Funk Run with an 18′ x 10′ Precast Concrete Box Culvert including roadway reconstruction, resurfacing, drainage, and other miscellaneous construction
- 700 CY Class 3 Excavation, 300 CY in Rock
- 45 LF 30″ Diameter Drilled Rock Socket Caissons
- 115 LF Steel Beam Soldier Piles
- 365 SF Precast Concrete Lagging