Project Description
Phase 1: . Excavate 75,000 CY of lake sediment and transport to landfill for disposal. Also excavated 15,000 CY of sediment and dispose at county waste facility
Phase 2: Excavate 225,000 CY of lake Sediment and transport to county waste disposal site.
- 250 LF 18” HDPE Temporary Lakebed Culverts
- 470 LF 24” HDPE Temporary Lakebed Culverts
- Construct Lake Access Ramps
- Construct Truck Washes
- Install/Realign/Remove Stream Diversions
- Emergent Wetlands and Shoreline Scrub-Shrub Plantings
- Install 393 Porcupine Cribs
- 170 EA Rock Humps
- 325 CY Gravel Placements
- 7,820 LF Coir Logs